The scheme, at Howden Water Treatment Works near Selkirk, consists of 2,112 ground-mounted solar panels and 15 racks of batteries to store the power generated – which will meet over a third of the site’s power usage and support Scottish Water’s drive to reach net zero emissions by 2040.