The first of its kind in the UK, the scheme has seen the installation of a hydro turbine at Hamilton Waste Water Treatment Works in South Lanarkshire and is expected to generate 0.42GWh of green electricity each year – the equivalent of boiling around 1.8 million kettles annually.