
The projects have seen 512 photovoltaic (PV) panels installed at Bothwellbank Waste Water Treatment Works in South Lanarkshire, which are able to generate 0.23GWh of power and will offset around a fifth of the site’s energy needs.
The projects have seen 512 photovoltaic (PV) panels installed at Bothwellbank Waste Water Treatment Works in South Lanarkshire, which are able to generate 0.23GWh of power and will offset around a fifth of the site’s energy needs.
The first of its kind in the UK, the scheme has seen the installation of a hydro turbine at Hamilton Waste Water Treatment Works in South Lanarkshire and is expected to generate 0.42GWh of green electricity each year – the equivalent of boiling around 1.8 million kettles annually.